What Should Be Paid Attention To During The Installation And Debugging Of Stamping Molds?

Mar 14, 2024 Leave a message

The installation and debugging of stamping molds need to be particularly careful. Generally, large stamping molds are not only expensive, but also heavy and difficult to move. Personal safety should always be the top priority. A pad should be added between the upper and lower molds of the stamping die without a restriction device. After cleaning the punching machine workbench, the mold to be tested should be placed in an appropriate position on the table. Secondly, during the fixing process of the stamping die, it should be ensured that the same bolt has a consistent and ideal pre tightening force. This can effectively prevent excessive or insufficient pre tightening force caused by errors in force, gender, size, etc., as well as changes in the same pre tightening force, which can lead to upper and lower mold errors, gap changes, and blade cutting faults during the drawing process. Before the trial mold, the complete set of preparation work for the stamping mold should be done. Prepare the normal production of the stamping mold, and start punching the mold 3-5 times with an empty stroke. After confirming that the mold is working properly, try the mold again. Perform secondary adjustment and control on the depth of the convex mold entering the concave mold, check and confirm the performance and operational flexibility of the mechanisms and devices for guiding, feeding, pushing, side pressing, and spring pressing of the convex mold, and then make appropriate adjustments to achieve the optimal technical state of the convex mold.

Send Inquiry

Send Inquiry